Industrial Turbine Blade Refurbishment from Japan
Gas turbine blades exported to specialized facility for coating restoration, edge repair, and NDT testing before reassembly in US power plants. Qualifies under 9813.00.05 as heavy industrial components sent for specialized processing essential to US energy infrastructure maintenance. Blades return with extended service life.
Duty Rate — Japan → United States
12.5%
Rate breakdown
9903.05.4912.5%Section 301 (forced labor) — Japan (col1 rate < 12.5 percent): MFN < 12.5% → total duty capped at 12.5%
Import Tips
• Provide OEM specifications and pre/post processing documentation; ensure repair doesn't exceed 35% value addition; coordinate with bonded warehouse upon return