New

Ask Wove anything about tariffs.

Try Tariff Assistant

Assembled Wind Turbine with US Generator from Germany

Vestas wind turbine nacelle assembled abroad incorporating US-manufactured generator exported ready for gearbox integration. Generator bolted and electrically connected with alignment as assembly process. 9802.00.80.69 duty-free on generator.

Duty Rate — Germany → United States

10%

Rate breakdown

9903.05.3910%Except for products described in headings 9903.05.85–9903.05.92 and 9903.05.97, articles the product of a member state of the European Union, with an ad valorem (or ad valorem equivalent) rate of duty under column 1 less than 10 percent, as provided for in U.S. note 52 to this subchapter

Import Tips

• Generator megawatt rating and specifications must match export documents,Tower integration documentation separates nacelle vs complete turbine,Verify generator windings untouched during foreign assembly operations