</>Build with Tariff Intelligence|Programmatic access to tariff calculations and HS code classification.Explore Developer Resources →

Assembled Wind Turbine with US Generator from Germany

Vestas wind turbine nacelle assembled abroad incorporating US-manufactured generator exported ready for gearbox integration. Generator bolted and electrically connected with alignment as assembly process. 9802.00.80.69 duty-free on generator.

Duty Rate — Germany → United States

10%

Rate breakdown

9903.05.3910%Section 301 (forced labor) — European Union member state (col1 rate < 10 percent): MFN < 10% → total duty capped at 10%

Import Tips

Generator megawatt rating and specifications must match export documents,Tower integration documentation separates nacelle vs complete turbine,Verify generator windings untouched during foreign assembly operations