Serviced Wind Turbine Gearbox from Japan
Vestas wind turbine gearbox exported for bearing replacement and gear shaving. Returned improved under 9802.00.50 for renewable energy equipment maintenance. Statistical: 9802.00.5040-8483.40.5080.
Duty Rate — Japan → United States
12.5%
Rate breakdown
9903.05.4912.5%Section 301 (forced labor) — Japan (col1 rate < 12.5 percent): MFN < 12.5% → total duty capped at 12.5%
Import Tips
• ISO vibration analysis post-service
• Export crane certificates for handling
• Calculate duty on gearbox overhaul invoice