Serviced Wind Turbine Gearbox from China
Vestas wind turbine gearbox exported for bearing replacement and gear shaving. Returned improved under 9802.00.50 for renewable energy equipment maintenance. Statistical: 9802.00.5040-8483.40.5080.
Duty Rate — China → United States
12.5%
Rate breakdown
9903.05.3112.5%Section 301 (forced labor) — additional 12.5% ad valorem on products of China
Import Tips
• ISO vibration analysis post-service
• Export crane certificates for handling
• Calculate duty on gearbox overhaul invoice