Lockheed Martin C-130 Wing Pylon from Germany
Engine pylon assembly for C-130 Hercules exported for fatigue testing and returned unchanged. HTS 9801.00.10.79 for US military heading 8807 part returned within 3 years maintaining original specifications and value.
Duty Rate — Germany → United States
10%
Rate breakdown
9903.05.3910%Section 301 (forced labor) — European Union member state (col1 rate < 10 percent): MFN < 10% → total duty capped at 10%
Import Tips
• Fatigue test protocols essential; maintain Lockheed Martin engineering change records showing no mods
• ITAR export documentation mandatory