Modular Steel Office Cabin from China
A prefabricated steel office cabin designed for quick on-site assembly, featuring pre-fitted internal walls, windows, and electrical wiring. It falls under HTS 9406.90.01.90 as a prefabricated building finished in the factory and entered as elements for assembly into a permanent office structure.
Duty Rate — China → United States
52.9%
Rate breakdown
9903.82.0925%Except as provided for in headings 9903.82.16, 9903.82.20–9903.82.26 and 9903.85.68, articles of copper and derivative aluminum and steel articles, as provided for in subdivisions (c)(vi)–(viii) and (xi) of U.S. note 16 to this subchapter
9903.88.0325%Except as provided in headings 9903.88.13, 9903.88.18, 9903.88.33, 9903.88.34, 9903.88.35, 9903.88.36, 9903.88.37, 9903.88.38, 9903.88.40, 9903.88.41, 9903.88.43, 9903.88.45, 9903.88.46, 9903.88.48, 9903.88.56, 9903.88.64, 9903.88.66, 9903.88.67, 9903.88.68, or 9903.88.69, articles the product of China, as provided for in U.S. note 20(e) to this subchapter and as provided for in the subheadings enumerated in U.S. note 20(f)
9903.05.900%Articles already subject to Section 232 (steel/aluminum/copper + derivatives, autos + parts, wood, medium/heavy vehicles + parts, semiconductors, patented pharma) — U.S. note 52(f)
Import Tips
• Verify that all modular elements are entered together with assembly instructions to qualify as prefabricated buildings under note to heading 9406
• Include engineering certifications proving factory pre-finishing to avoid reclassification as mere construction materials