Rock Installation Vessel from Germany
Split-hopper barge for placing rock armor in coastal protection works, navigation subsidiary to material placement. Fits HTS 8905.90.50.00 'other' category.
Duty Rate — Germany → United States
10%
Rate breakdown
9903.05.3910%Section 301 (forced labor) — European Union member state (col1 rate < 10 percent): MFN < 10% → total duty capped at 10%
Import Tips
• Hopper capacity and door opening specs document placement function
• Environmental permits for rock placement operations
• Not classifiable as dredger without suction dredging capability