Rock Installation Vessel from Canada
Split-hopper barge for placing rock armor in coastal protection works, navigation subsidiary to material placement. Fits HTS 8905.90.50.00 'other' category.
Duty Rate — Canada → United States
10%
Rate breakdown
9903.05.2910%Section 301 (forced labor) — additional 10% ad valorem on products of Canada
Import Tips
• Hopper capacity and door opening specs document placement function
• Environmental permits for rock placement operations
• Not classifiable as dredger without suction dredging capability