High-Speed Spindle Assembly for Combined Cycle Power Plant from Mexico
Advanced spindle and rotor assembly for gas turbines in combined cycle plants, integrating steam and gas cycles for efficiency. Precision-balanced for supercritical speeds. HTS 8411.99.9030 applies to such non-aircraft gas turbine components.
Duty Rate — Mexico → United States
12.4%
Rate breakdown
9903.05.5510%Section 301 (forced labor) — additional 10% ad valorem on products of Mexico
Import Tips
• Pair with power plant EPC contracts for context in customs entry to affirm stationary end-use
• Calibrate declared value using OEM cost data; imbalances trigger audits