Small Gas Turbine for Data Center Backup from China
3,800 kW rapid-start gas turbine for Tier IV data center uninterruptible power. Classified HTS 8411.81.80.90 for other gas turbines used in critical infrastructure.
Duty Rate — China → United States
52.5%
Rate breakdown
9903.82.0925%Except as provided for in headings 9903.82.16, 9903.82.20–9903.82.26 and 9903.85.68, articles of copper and derivative aluminum and steel articles, as provided for in subdivisions (c)(vi)–(viii) and (xi) of U.S. note 16 to this subchapter
9903.88.0125%Except as provided in headings 9903.88.05, 9903.88.06, 9903.88.07, 9903.88.08, 9903.88.10, 9903.88.11, 9903.88.14, 9903.88.19, 9903.88.50, 9903.88.52, 9903.88.58, 9903.88.60, 9903.88.62, 9903.88.66, 9903.88.67, 9903.88.68, or 9903.88.69, articles the product of China, as provided for in U.S. note 20(a) to this subchapter and as provided for in the subheadings enumerated in U.S. note 20(b) [to this subchapter]
9903.05.900%Articles already subject to Section 232 (steel/aluminum/copper + derivatives, autos + parts, wood, medium/heavy vehicles + parts, semiconductors, patented pharma) — U.S. note 52(f)
Import Tips
• Uptime Institute Tier certification supports critical infrastructure classification
• Sub-10 second start time specs distinguish from standard generators
• ASHRAE thermal guidelines compliance for data center environment