Peak Shaving Gas Turbine Package from China
Skid-mounted 4,500 kW gas turbine package for utility peak shaving during high demand periods. Falls under HTS 8411.81.80.90 as other gas turbine under 5,000 kW for temporary power.
Duty Rate — China → United States
52.5%
Rate breakdown
9903.82.0925%Except as provided for in headings 9903.82.16, 9903.82.20–9903.82.26 and 9903.85.68, articles of copper and derivative aluminum and steel articles, as provided for in subdivisions (c)(vi)–(viii) and (xi) of U.S. note 16 to this subchapter
9903.88.0125%Except as provided in headings 9903.88.05, 9903.88.06, 9903.88.07, 9903.88.08, 9903.88.10, 9903.88.11, 9903.88.14, 9903.88.19, 9903.88.50, 9903.88.52, 9903.88.58, 9903.88.60, 9903.88.62, 9903.88.66, 9903.88.67, 9903.88.68, or 9903.88.69, articles the product of China, as provided for in U.S. note 20(a) to this subchapter and as provided for in the subheadings enumerated in U.S. note 20(b) [to this subchapter]
9903.05.900%Articles already subject to Section 232 (steel/aluminum/copper + derivatives, autos + parts, wood, medium/heavy vehicles + parts, semiconductors, patented pharma) — U.S. note 52(f)
Import Tips
• NERC reliability standards documentation for grid interconnection
• Black start capability specs important for utility classification
• Temporary/permanent installation affects potential bond requirements