Packaged Boiler Economizer Kit from Germany
Complete factory-assembled economizer kit including tubes, headers, casing, and mounting hardware for field installation on boilers. Specifically HTS 8404.10.00.10 as auxiliary plant despite kit packaging, due to exclusive boiler application. Includes pre-wired temperature controls.
Duty Rate — Germany → United States
13.5%
Rate breakdown
9903.03.0110%Except for products described in headings 9903.03.02–9903.03.11, articles the product of any country, as provided for in subdivision (aa) of U.S. note 2 to this subchapter
Import Tips
• Include factory test reports and assembly drawings; verify kit completeness to avoid parts classification; ensure control system certifications meet destination standards