Undelayed Detonator from Canada
Undelayed detonating cap for oil and gas well perforation operations, ensuring precise charge timing in downhole environments. Pressure-resistant construction. HTS 3603.40.00.00.
Duty Rate — Canada → United States
10.2%
Rate breakdown
9903.05.2910%Section 301 (forced labor) — additional 10% ad valorem on products of Canada
Import Tips
• Include pressure rating (10,000+ psi) certification; oilfield end-user statements required; hermetic sealing verification mandatory