Long-Period Delay Cap from Germany

Detonating cap with extended delay periods (500ms-10s) for specialized underground contour blasting patterns. Provides sequential rock fracture control. Covered by HTS 3603.40.00.00.

Duty Rate — Germany → United States

10.2%

Rate breakdown

9903.03.0110%Except for products described in headings 9903.03.02–9903.03.11, articles the product of any country, as provided for in subdivision (aa) of U.S. note 2 to this subchapter

Import Tips

Document exact delay periods for blasting plan approval; temperature range testing required for hot climates; avoid X-ray inspection to prevent initiation