Long-Period Delay Cap from China
Detonating cap with extended delay periods (500ms-10s) for specialized underground contour blasting patterns. Provides sequential rock fracture control. Covered by HTS 3603.40.00.00.
Duty Rate — China → United States
17.7%
Rate breakdown
9903.03.0110%Except for products described in headings 9903.03.02–9903.03.11, articles the product of any country, as provided for in subdivision (aa) of U.S. note 2 to this subchapter
9903.88.157.5%Except as provided in headings 9903.88.39, 9903.88.42, 9903.88.44, 9903.88.47, 9903.88.49, 9903.88.51, 9903.88.53, 9903.88.55, 9903.88.57, 9903.88.65, 9903.88.66, 9903.88.67, 9903.88.68, or 9903.88.69, articles the product of China, as provided for in U.S. note 20(r) to this subchapter and as provided for in the subheadings enumerated in U.S. note 20(s)
Import Tips
• Document exact delay periods for blasting plan approval; temperature range testing required for hot climates; avoid X-ray inspection to prevent initiation