Long-Period Delay Cap from China
Detonating cap with extended delay periods (500ms-10s) for specialized underground contour blasting patterns. Provides sequential rock fracture control. Covered by HTS 3603.40.00.00.
Duty Rate — China → United States
20.2%
Rate breakdown
9903.88.157.5%Except as provided in headings 9903.88.39, 9903.88.42, 9903.88.44, 9903.88.47, 9903.88.49, 9903.88.51, 9903.88.53, 9903.88.55, 9903.88.57, 9903.88.65, 9903.88.66, 9903.88.67, 9903.88.68, or 9903.88.69, articles the product of China, as provided for in U.S. note 20(r) to this subchapter and as provided for in the subheadings enumerated in U.S. note 20(s)
9903.05.3112.5%Section 301 (forced labor) — additional 12.5% ad valorem on products of China
Import Tips
• Document exact delay periods for blasting plan approval; temperature range testing required for hot climates; avoid X-ray inspection to prevent initiation