Gold Mine Tailings with Arsenic from Japan

Tailings from gold mining operations containing residual gold and arsenic, unbeneficiated for industrial reprocessing. Classified under HTS 2620.99.7580 as other residues for metal/compound manufacture.

Duty Rate — Japan → United States

10%

Rate breakdown

9903.03.0110%Except for products described in headings 9903.03.02–9903.03.11, articles the product of any country, as provided for in subdivision (aa) of U.S. note 2 to this subchapter

Import Tips

Mine site affidavits confirming tailings not advanced (no flotation/enrichment)

Arsenic content declaration mandatory for environmental compliance

Volume/weight assays for accurate statistical reporting

Gold Mine Tailings with Arsenic from Japan — Import Duty Rate | HTS 2620.99.75.80