Modular Gym Building Unit from Germany
> A pre-fitted modular unit for fitness centers, featuring rubberized flooring and internal partitions. It is factory-completed and designed for on-site assembly, classifying as a prefabricated building under heading 94.06.
Duty Rate — Germany → Canada
4.5%
Import Tips
• > Confirm the unit is not classified as furniture (Chapter 94, headings 9401-9403) by ensuring it is a complete building structure
• Keep documentation showing factory completion and assembly instructions
• Check with local authorities for any occupancy permits required